Your tax dollars at work...   

Click any small picture for a full size view. 
Click your browser's "Back" button to return to this page.

bulletTicket Booth Progress (December 23, 2008)

 
bulletStadium Plaza nears completion (December 23, 2008)

Return to the Top of the Page

bulletVikings take the field (October 17, 2008)

 
bulletPlaying field is complete (October 17, 2008)

 
bulletScoreboard installation (October 17, 2008)

 
bulletTicket area progress (October 8, 2008)

Return to the Top of the Page

bulletVisitor side nears completion.  (October 7, 2008)

 
bulletHome side nears completion.  (September 24, 2008)

 
bulletSafety railings and exits in place.  (September 24, 2008)

 
bulletConcrete area in front of honor wall.  (September 24, 2008)

Return to the Top of the Page

bulletPress Box installation.  (September 15, 2008)

 
bulletField lights are complete.  (September 9, 2008)

 
bulletHome side bleacher installation progress. (August 25, 2008)

 
bulletSod installation complete (August 25, 2008)

 
bulletNew sod passes inspection by Principal Morris (August 21, 2008)

 
bulletBleachers take shape. (August 21, 2008)

Return to the Top of the Page

bulletHome side installation progress (August 19, 2008)

 
bulletBleacher installation begins (August 19, 2008)

 
bulletElevator complete (August 19, 2008)

 
bulletHonor Wall nears completion (August 19, 2008)

 
bulletLong Jump pits (August 19, 2008)

Return to the Top of the Page

bulletTrack lanes are striped (August 14, 2008)

 
bulletTicket entrance takes shape (August 14, 2008)

 
bulletHonor wall progress (August 14, 2008)

 
bulletElevator is unloaded (August 14, 2008)

Return to the Top of the Page

bulletTrack gets first layer of topcoat (July 30, 2008)

 
bulletHome side takes shape (July 30, 2008)

 
bulletHonor Wall foundation (July 30, 2008)

 
bulletLights are raised (July 30, 2008)

Return to the Top of the Page

bulletAll weather track installation (July 23, 2008)

 
bulletLight assembly (July 23, 2008)

Return to the Top of the Page

bulletPavement complete (July 14, 2008)

 
bulletLight pole bases installed (JUly 14, 2008)


Parking lot expansion (July 14, 2008)

 
bulletField sprinkler testing (July 14, 2008)

Return to the Top of the Page

bulletTrack paving (July 3, 2008)

 
bulletSidewalk installation (July 3, 2008)

 
bulletUnloading lights (July 3, 2008)

 
bulletField grading (June 10, 2008)

 
bulletTicket entrance (June 10, 2008)

Return to the Top of the Page

bulletSouth end retaining wall (June 10, 2008)

 
bulletHome side retaining wall (June 10, 2008)

 

Return to the Top of the Page

bulletHome side walkway footings (May 5, 2008)

 
bulletSouth end curb and gutter (May 5, 2008)

Return to the Top of the Page

bulletThe valley gutter is poured (April 28, 2008)

Return to the Top of the Page

bulletGrading (March 25, 2008)

 
bulletLeveling (March 20, 2008)

Return to the Top of the Page

bulletExcavating (March 18, 2008)

Return to the Top of the Page

bulletAfter demolition

Return to the Top of the Page

bulletBefore demolition

Return to the Top of the Page